Synchronized Requirements Planner
PRODUCTION EFFICIENCY OPTIMIZATION
WITH MULTI-LEVEL BOM SUPPORT
DELMIA Ortems Synchronized Requirements Planner (SRP) is used to create multi-level bills of materials (BOMs) and joint semi-finished product orders for a variety of finished products. The module provides production planning and detailed manufacturing scheduling as part of a single planning system (APS).
Based on a proven innovative optimization engine, SRP will simultaneously generate orders for all BOM levels, considering the availability of machines, devices, operations, and materials under limited performance conditions.

SOLUTION FEATURES

- Optimization of inventories and stock levels for semi-finished products
- The ability to configure overproduction alerts
- Simultaneous delivery of semi-finished products for several finished goods from one order (Material Overlap Links)
- Optimization of work orders in terms of current and expected inventory levels
- Decision-making support through the visualization of the order execution process